Our projects
Here you get an insight into past successfully realised projects of EnTeHa GmbH & Co. KG
Assembly / Commissioning
Automation of a Hermle C30U with KUKA KR210
The Hermle C30U can be automated by integrating the KUKA KR210 to optimise the manufacturing process and increase production capacity. This combination enables precise and efficient loading and unloading of workpieces.
Contact us
Assembly & dismantling / transport
Loading a DMU 75 monoBLOCK
We exchanged a DMU 125 P for a DMU 75 monoBLOCK for our customer.
The removal and insertion was carried out through a roof opening on the 4th floor.
In addition to disassembly and reassembly, we also coordinated the heavy-duty forwarders and the mobile crane.
Contact us
New in the portfolio
Price on request
Mould mounting surface | Ø 50 / VDI 50 mm |
Weight | 70 kg |
2.650,00 €
Mould mounting surface | Ø 30 mm |
Shipping weight | 50 kg |
Shipping measure | approx. 600*400*200 mm |
Price on request
Mould mounting surface | 50 mm |
Weight | 70 kg |
Price on request
x-way | 300 mm |
y-way | 160 mm |
z-way | 340 mm |
Total power requirement | 2 kW |
Machine weight approx. | 1 t |
Price on request
x-way | 300 mm |
y-way | 160 mm |
z-way | 340 mm |
Total power requirement | 2 kW |
Machine weight approx. | 1,2 t |
299,00 €
Table diameter | 300 mm |
Table load | ? t |
Table height | 300 mm |
Total power requirement | 0 kW |
Machine weight approx. | 50 kg |
990,00 €
Centre height | ? mm |
Total power requirement | - kW |
Machine weight approx. | - t |
Space requirement approx. | 400*330*300 m |
Price on request
Centre height | 160 mm |
Machine weight approx. | 58 kg |
Space requirement approx. | 400*350*400 mm |
Get in touch with us